In Cambodia, for the “Water supply” sector, the Niroth Water Production Facilities (phase 1) project was subject to an evaluation in October and November 2016.
The project was implemented in the context of the Phnom Penh Water Supply Authority’s (PPWSA) plan to increase its production capacity in order to sustain the extension of water supplies in the Phnom Penh periphery as well as the densification of connections in already-covered areas.
One of the objectives of the project was to increase the number of domestic connections by 60,000 units between 2010 and 2016. This objective was perfectly fulfilled, with 69,453 new domestic connections made over that time period. The funded water treatment facility (Niroth-1) was much needed to avoid downscaling the PPWSA connections program and keeping other water production facilities at critical overdesign production rates. The sustainability of the program is ensured.
The close interaction between the AFD and the implementing agency is much appreciated and was a key factor of success for the program.
-
on the same region
Institutional documentpublished in March 2024Institutional documentpublished in March 2024Vidéopublished in March 2024Institutional documentStrategy Documentspublished in February 2024Institutional documentStrategy Documentspublished in December 2023Vidéopublished in October 2023 -
on the same topic
Institutional documentInfographicspublished in March 2024Institutional documentReviews and Activity Reportspublished in March 2024Research documentpublished in January 2024Evaluation documentpublished in December 2023Vidéopublished in November 2023Vidéopublished in August 2023 -
from the same collection
Evaluation documentpublished in October 2023Evaluation documentpublished in May 2023Evaluation documentpublished in May 2023Evaluation documentpublished in February 2023Evaluation documentpublished in November 2022Evaluation documentpublished in October 2022