
In this paper, we analyze the process of water urbanization in the periphery of El Alto, in the context of the urban sprawl growth; thus, the administration of the public drinking water company puts into practice and tension multiple paths, ranging from the requirement of certain administrative conditions, the dispute over political loyalties, the reaction to local pressures and mobilizations, to even the provision of water based on the economic efforts and community work of the residents themselves through the Obras con Participación Vecinal (OPV, Works with Neighborhood Participation) program. As a whole, these elements promote expressions and exercises of a particular corporate citizenship that materializes the access to water.
-
on the same region
Research documentpublished in November 2020Research documentpublished in November 2020Research documentpublished in November 2020Research documentpublished in November 2020Research documentpublished in October 2020Research documentpublished in October 2020 -
on the same topic
Vidéopublished in January 2021Research documentpublished in December 2020Institutional documentpublished in December 2020Research documentpublished in November 2020Research documentpublished in November 2020Research documentpublished in November 2020 -
from the same collection
Research documentpublished in January 2021Research documentpublished in December 2020Research documentpublished in December 2020Research documentInequality in Public Good Provision and Attitude Towards Taxation: Sub-national Evidence from Africapublished in November 2020Research documentpublished in November 2020Research documentpublished in November 2020